Government reveals proposed plans for new aquatic centre for 2032 Games

Government announces trio of architecture firms and reveals proposed design for new National Aquatic Centre

By state political reporter Jack McKay

  • Topic:Olympic Games Venues

Posted

Wed 22 Jul 2026 at 7:55pm

, updated

Wed 22 Jul 2026 at 8:30pm

A design showing a building with its roof shaped like a wave and a train passing in the foreground.

The design for the National Aquatic Centre to be built for the 2032 Olympic and Paralympic Games at the site of Centenary Pool at Spring Hill. (Supplied: Queensland government)

In short:

The state government has chosen three firms to design a new National Aquatic Centre at Centenary Pool and revealed renders of the proposed design.

Deputy Premier Jarrod Bleijie refused to directly answer whether the proposed centre’s seating capacity would be scaled back to avoid cost blowouts.

What’s next?

The Games Independent Infrastructure and Coordination Authority will take possession of the site from September 1.

Originally published on www.abc.net.au — View original

By

Leave a Reply

Your email address will not be published. Required fields are marked *